Non-potable Water Program

Schematic
SEE this building schematic.

In September 2012, the City and County of San Francisco adopted the Onsite Water Reuse for Commercial, Multi-family, and Mixed Use Development Ordinance. Commonly known as the Non-potable Water Ordinance, it added Article 12C to the San Francisco Health Code, allowing for the collection, treatment, and use of alternate water sources for non-potable applications in individual buildings and at the district-scale.

The SFPUC is working with state and national partners such as the U.S. Water Alliance to establish guidance and policy frameworks to help local jurisdictions overcome barriers for onsite water reuse. The National Blue Ribbon Commission was established to craft a model state policy framework and identify new business models for water utilities that are implementing non-potable water programs. For more information on our state and national efforts, please click here.

Do the requirements apply to my project? 

In July 2015, Article 12C became a mandatory requirement for all new construction of 250,000 square feet or more of gross floor area. Article 12C requires the following:

  • New development projects of 250,000 square feet or more of gross floor area that haven’t received a site permit prior to November 1, 2016 are required to install and operate an onsite non-potable water system to treat and reuse available graywater, rainwater, and foundation drainage for toilet and urinal flushing and irrigation, and
  • New development projects of 40,000 square feet or more of gross floor area are required to prepare water budget calculations.

How do I comply with the requirements? 

Critical NP Program Information

Municipal Code:
Article 12C, San Francisco Health Code

Contact Info:

SFPUC NP Program
nonpotable@sfwater.org
(415) 551-4734

SFDPH NP Program
dph.nonpotable@sfdph.org

SFPUC Cross-Connection Control Program
(650) 652-3199

DPW Encroachment Permits
(415) 554-5810

Plumbing Inspection Division 
(415) 558-6570

Step 1: Submit a Water Budget Application to SFPUC
The Water Budget Applications and Water Use Calculators for single-building and district-scale non-potable water systems are located below. The Water Use Calculator must be completed and submitted with your project's Water Budget Application.

Step 2: Submit a Non-potable Implementation Plan to SFPUC (applicable only to district-scale systems)
The Non-potable Implementation Plan must be prepared in accordance with the following checklist.

Step 3: Submit an Engineering Report to SFDPH
The Engineering Report must prepared by a registered professional engineer. Rainwater harvesting projects for non-spray irrigation, and foundation drainage or gray water projects for subsurface irrigation, do not need to submit an Engineering Report.

Step 4: Obtain Building Permits and Construct the Onsite Water System
SFDPH approval of the Engineering Report and a Plan Check by the Plumbing Inspection Division (PID) are required before PID will issue a plumbing permit. Please contact PID at (415) 558-6570 with questions about the required Plan Check.

Step 5: Obtain Encroachment Permits from SFPW (if applicable)
Non-potable water systems with infrastructure located within the public right-of-way are required to obtain an Encroachment Permit from the San Francisco Public Works Department (SFPW). 

Step 6: Schedule a Cross-connection Test
Non-potable water systems must include the required level of backflow protection as set forth by the San Francisco Public Utilities Commission Cross-Connection Control Program. Please see Required Levels of Backflow Protection for Non-potable Water Systems.

Step 7: Obtain a Permit to Operate from SFDPH
A Construction Certification letter and successful Cross Connection test are required prior to operation. Rainwater harvesting projects for non-spray irrigation, and foundation drainage or graywater projects for subsurface irrigation, do not need to obtain a Permit to Operate.

Step 8: Conduct Ongoing Monitoring, Reporting, and Inspections
Ongoing monitoring is crucial to ensure the onsite water system is in proper working order. Operators report the results of the ongoing monitoring to SFDPH using the Discharge Monitoring Report form at the frequency identified in their Permit to Operate.

Non-potable Grant Program
The SFPUC grant assistance program for alternate water source projects is closed. Please check our web page in July 2017 for updates.

Additional Resources

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Download Acrobat Reader Download Flash Player Download QuickTime Download Windows Media Player Download Microsoft Silverlight Download Word Viewer Download Excel Viewer Download PowerPoint Viewer
Last updated: 3/6/2017 3:02:32 PM